OK
Actual mult within ±100.0% of expected
(e.g., 0.00x - 2.00x if expected 1.0x)
Minor
Wrong size but notional deviation < $20
Major
Actual mult 100.0% - 200.0% off expected
(e.g., -1.00x - 0.00x or 2.00x - 3.00x)
Critical
Actual mult >200.0% off, OR missing/unexpected position with notional > $20